TRAFFIC INFRASTRUCTURE

Groundbreaking Ceremony

On June 8, 2013, in Cam Ranh City, Khanh Hoa, the groundbreaking ceremony of the National Highway 1A construction project was opened from Km1488 to Km1525 section through Khanh Hoa province under BOT form (investment in exploitation). & transfer).

The project is invested by 194 Construction Investment Joint Stock Company. At the ceremony, Saigon & Hanoi Commercial Joint Stock Bank (SHB) officially signed a credit financing agreement for the project with a total amount of VND 2,354 billion. Assets secured for loans are all rights to exploit and collect construction and other assets.

The expansion of National Highway 1A section from Km1445 to Khanh Hoa province is an important part and in line with the orientation of Vietnam transport development along the North – South axis. The number of means of transport on National Highway 1A in 06 years from 2006 to 2012 increased quite high, in addition to the transportation demand of vehicles on the road under the project, in the future, it is expected that the rate of rapid growth will increase causing QL1A to overload. Therefore, expanding QL 1A is an urgent requirement to ensure smooth traffic as well as to facilitate development for the region. The expansion of National Highway 1A (the section running through Khanh Hoa province) together with the national highway, provincial road, and district road network in the region will create a continuous and smooth traffic network to ensure national security for the region. Central – Highlands and plays an important role in promoting economic development not only in Khanh Hoa province but also in the region as well as in the whole country.

Mr. Tran Lenh Phu – General Director of Construction Investment Joint Stock Company 194 said: “As a company with many experiences in the construction of road and bridge projects, there have been many big construction packages, we pledged to implement the project with the right quality and schedule. This project belongs to one of 16 project chains in the Government’s National Highway 1A expansion program, the implementation of the project will contribute to promoting the risk situation when circulation of vehicles on the route. current road. ”

TRAFFIC INFRASTRUCTURE

PROJECT PROGRESS TO DATE 10/06/2014

The project to expand National Highway 1A section Km 1488 – Km1525 Cam Lam district, Cam Ranh City, Khanh Hoa Province, is invested to build under the BOT form. The project is expected to be completed and put into use by the end of 2015. The road section will be upgraded to 4 lanes for motor vehicles and 2 rudimentary lanes with a width of 25.5 M.

This is a national key project, meeting the demand of goods transportation, local socio-economic development; while contributing to reducing traffic accidents. With the direction of Khanh Hoa Provincial People’s Committee and the Ministry of Transport, Construction Investment Joint Stock Company 194 combined with the sponsor to arrange capital to complete the upgrading of National Highway 1A. Regularly coordinating with local departments and agencies, the province’s functional agencies strictly comply with the provisions of law on construction investment to ensure the quality of works, safe and effective, bring progress and soon bring the project. into use.

And these are the latest images of the project

The vertical culvert system is nearly complete

 

Horizontal sewer system has been installed

 

The final manholes are being concreted

 

The route is being repeated many times to ensure no subsidence.

TRAFFIC INFRASTRUCTURE

Communion ceremony 25/09/2015

On September 25, 2015, the technical traffic ceremony on National Highway 1A through Khanh Hoa province was successfully organized. In the ceremony, there were guests such as Mr. Dinh La Thang – Minister of Transport, Mr. Le Thanh Quang – Chairman of Khanh Hoa Provincial People’s Council, Mr. Nguyen Van The – Vice Minister of Communications and Transport. Transportation, etc. leaders of the project management board 7, Khanh Hoa provincial agencies and agencies and construction consultancy contractors, investors, leaders and employees of the company construction investment shares 194.

After nearly 26 months of traffic, the project has completed the quality assurance, traffic safety, occupational safety and hygiene and exceeded the 4-month progress compared to the requirements of the Ministry of Transport, 15 month compared to government requirements. Therefore, there has been a significant reduction in the total investment of construction projects compared to the expected total of the initial level. The completed project has been greatly impacting the socio-economic development, ensuring national security, especially the traffic accident situation of Highway 1 through the province so far has reduced deeply all three. criteria. In particular, the number of cases decreased by 50% over the same period when the project was not invested. Up to now, the two sides along the route, the construction works, the new industrial offices are bustling shops, along with the changes of life of people in the project area have and being developed day by day according to the new look of the highway 1. 26 months of construction investment, especially in the period to 2015, the engineers and employees of the road and bridge industry have not managed day and night Rain and sunshine, holidays and Tet days are still soaked with the sweat of the school’s feet, now look back at the completed project as a beautiful picture of the traffic road from North to South.

 

Mr. Tran Lenh Phu – General Director of Construction Investment Joint Stock Company 194 spoke at the ceremony

 

Mr. Tran Lenh Phu – General Director of Construction Investment Joint Stock Company 194 said: “We, the investor and the construction units really see this as a happiness, achieved so thanks largely. from the help of the Khanh Hoa Provincial People’s Committee, the provincial departments of the provincial government reconciled the orange and orange districts. In just a short time, nearly 500 households affected by the project have been handed over to help investors complete the schedule according to the direction of the Ministry of Transport and in particular, thus achieving the direction The Ministry of Transport has drastically issued many key policies and policies to deal with from the deeply directed attention of the Ministry of Transport and Communication, which is a huge part of the driving force affecting the whole The project’s full-time engineer staff energized to complete the project earlier than planned. It must be said that this is also a feat in the field of investment in transport infrastructure construction.

Ladies and gentlemen, however, the operation phase still faces many difficulties, our investor will need to try harder, and look forward to your help. With only a few minutes left, the car bandwidth will be officially cut. September 25, 2015 for us marked an important event in the process of launching the whole industry. From the bottom of my heart, I change for all investors, consulting construction contractors would like to express my deep gratitude and wish you all health and happiness.

renting office

Building 194 Golden Building

BUILDING INFORMATION

194 GOLDEN BUILDING office building, invested by 194 Construction Investment Joint Stock Company, was built in 2008, located at 473 Dien Bien Phu, Ward 25, Binh Thanh District, Ho Chi Minh City. HCM is 100m from Hang Xanh crossroads. From here you can easily reach other districts in the city such as District 1, District 2, District 3, or Tan Son Nhat Airport and neighboring provinces such as Dong Nai and Binh Duong.

Around the building are universities, banks, supermarkets, Van Thanh eco-tourism area, this is a suitable and convenient place for the company to rent offices for work and business.


Building architecture:

The building is built 18 stories high, with an area of ​​618.64m² each, the total construction area is 11,476 m² including:

  • 2 basements: large area for parking lots with a capacity of more than 600 motorbikes 45 cars.
  • Ground floor to 14th floor: load bearing capacity 300kg / m2, complete ceiling height of 2.45m for office and meeting room rental.
  • Terrace: is a restaurant serving office lunch with Asian – European dishes suitable for all customers.

Fully installed buildings of modern equipment systems, meeting international standards (03 Kone elevators 1.75m / s. Ventilation system, Fire alarm system – Automatic fire-fighting Hochiki, System Air conditioning VRitsu Fujitsu General, Electrical System – Generator 1300 KVA 100% backup, CCTV system 24/24 …), with full range of utility services such as Internet, Leasedline, ADSL, electricity cable, cable TV of all suppliers in Vietnam …


Building operation team:

  • The Management is dynamic, enthusiastic, friendly.
  • Technical team, regularly maintain, monitor and repair defects in the building and promptly solve customer needs.
  • Professional security team works 24 hours.
  • The service team regularly cleans the clean public area, etc., satisfies customers.

Indoor tenants:

Currently, some customers are renting premises at the building to work offices and business locations such as HSBC Bank, Financial Group, large corporations in the world, multinational companies and companies. domestic company …

 

INFORMATION FOR LEASE

› Leasing office,Meeting room for rent: Meeting rooms from 80 to 100 people depending on customer needs, meeting rooms fully designed projector system, sound, wifi, drinking water services and modern facilities (with drinking water service) for conferences, seminars, presentations.

› Rental price: Rental price of office rent is calculated in VND / m2. Please contact the Building Management Board for the best price.

› Contact: Mr. Tam: 0903.399.554 / Mrs. Huong: 0986.978.789

 

PICTURES OF THE BUILDING

Overall, the building looks from Blue Crossroads

 

Main gate of the Building

 

Gate of the basement of the Building

 

High-speed elevator

 

Elevators of the Building

 

line officer

 

Large meeting room accommodating 80 to 100 people.

 

Small meeting room.

 

Restaurant terrace

 

Large power generator

 

Security Forces, Magazines 24/24

 

renting office

194 South Tower Building

BUILDING INFORMATION

The South Tower 194 building was put into operation in July 2016, located in the system of office rental buildings invested by Construction Investment Joint Stock Company 194, investor and construction and management after the building. 194 Golden Building No. 473 Điện Biên Phủ, P.25, Q. Bình Thạnh, TP. Ho Chi Minh.


BUILDING LOCATION

The South Tower 194 is located at B17-11 frontage of National Road 50, Binh Hung commune, Binh Chanh District, Ho Chi Minh City. The project has two road-facing surfaces, the West borders Highway 50, the North borders Binh Hung road, 100m away from Nguyen Van Linh Avenue.


BUILDING ARCHITECTURE

  • Basement :Large parking lot with an area of ​​1854.4 m² accommodating more than 500 motorbikes, 60 cars, 156 bicycles.
  • Ground floor and 14 floors for lease : The area of ​​each floor is 932.4 m² and the total floor area is 14,230 m². Floor load of 300kg / m², perfect ceiling height of 2.45 m.

The building is fully equipped with modern equipment systems, meeting international standards (4 Mitsubishi elevators at 1.75 m / s. Ventilation system, fire alarm system – automatic fire fighting system Fujitsu General VRF air conditioner, Electrical System – Generator 1300 KVA 100% backup, CCTV system …), with full range of utility services such as Internet, Leased line, Telephone, cable TV ….

Area for rent :From ground floor → floor 14 (ground floor → 3 for rent) with a total area of ​​1 floor 428m2 can be divided according to customer needs.


STAFF SUPPORT IN THE BUILDING

Dynamic and enthusiastic management board.

The maintenance team always checks and is ready to repair the equipment and customer support.

24-hour security team.

The service team regularly cleans and satisfies customers.


RENTAL PRICE AND CONTACT INFORMATION

The cheapest rent in the area

Please contact BQMr. Tam: 0903.399.554 / Mrs. Huong: 0986.978.


BUILDING PICTURES

Overall Building South Tower 194 viewed from Highway 50

 

Main lobby The building is equipped with a high-speed modern elevator system

 

Front of the building

 

South Tower 194 is equipped with a large capacity generator system