Project to expand Khanh Hoa Highway 1A

Project information

Groundbreaking Ceremony of the National Highway 1 Investment Construction Project
Section Km1488-Km1525 in Cam Lam district, TP.Cam Ranh, Khanh Hoa province under the form of BOT

To meet the demand of transport, reduce congestion and traffic accidents on the NH1 route as well as realize the importance of synchronous infrastructure construction under Resolution 13 NQ / TW dated January 16, 2012 of Executive Committee of the 11th Party Central Committee on building a synchronous infrastructure system to make our country basically become a modern-oriented industrial country by 2020 and Decision No. 355 / QD-TTg of February 25 / 2013 of the Prime Minister on adjusting the transportation development strategy to 2020 with a vision to 2030, in which the orientation of developing road transport infrastructure is to prioritize investment in upgrading and opening. wide National Highway 1A, largely completed in 2015 and completed the entire route by 2020. With the solution to strongly attract components economic participation in investment, expanding the form of the state and people work together, encouraging investment in the form of BOT.

Project of expanding National Highway 1 section Km1488-Km1525 Cam Lam district, Cam Ranh City, Khanh Hoa province is invested to build under the form of BOT (Investment – Exploitation – Transfer), Head Joint Stock Company Construction Investment 194 was assigned as an investor in Decision No. 1245 / QD-BGTVT dated May 10, 2013 of the Ministry of Transport. Scale of the project: The section running through the urban area includes Cam Duc town and Cam Ranh City with the width of the roadbed Bn = = 25.5m, including 4 lanes for motor vehicles, 2 lanes for rudimentary vehicles, separators and Safety strip and vertical drainage system. Particularly, the section running through the center of TP.Cam Ranh (Km1509 + 900 – Km1512 + 500), remains the same width of the existing foundation and road surface. Out-of-urban section: Width of roadbed B is = 20.5m, including 4 lanes for motorized vehicles; 2 lanes of rudimentary vehicles, separators and safety strips.

The project has a total investment of 2,699,564,000,000 VND (Two thousand six hundred and ninety nine billion, five hundred and sixty four million) with a total length of about 36.1 km (Km1488-Km1525) passing through the ward territory. Cam Thinh, TP.Cam Ranh, Khanh Hoa province. Expected time to complete at the end of 2015.

As one of the important segments of the National Highway 1 section of Hanoi – Can Tho section, when completed, it will be an economic driving force, contributing to reducing traffic accidents in the area for Khanh Hoa province in particular. and the whole country in general. More importantly, along with other projects to expand the National Highway 1, which is being urgently prepared by the Ministry of Transport, the project to invest in the construction of an expansion of National Highway 1 Section Km1488 – Km1525, Khanh Hoa province was built. will gradually concretize the Resolution No. 13-NQ / TW of the 11th Party Central Committee Executive Committee.